Right arrow Warehouse Floor Resurfacing Trowbridge

Trowbridge Warehouse
Floor Resurfacing & Overlays

We provide warehouse floor resurfacing and concrete overlay systems across Trowbridge and the wider West Wiltshire area. Existing concrete slabs are refurbished using bonded self levelling compounds, polymer modified cementitious overlays and resin finishes, specified to restore surface condition, improve levelness and support the daily demands of logistics, storage and production environments.

20 +

Years
Experience in Concrete Flooring

Our Trowbridge resurfacing work covers White Horse Business Park, Canal Road Industrial Estate, Railway Yard, North Bradley, Staverton, Southwick and nearby estates towards Westbury and Melksham. Sites range from converted textile and engineering buildings with varied floor build ups to modern distribution units supporting the A350 corridor. We assess slab condition, prepare the surface mechanically and install an overlay that achieves the required performance in line with BS 8204, BS EN 206 and established UK industrial practice.

Our Expertise

Right arrow Our Process

How We Resurface Warehouse
Floors in Trowbridge

STEP 1

Slab Survey,
Repair and Preparation

We begin with a structured review of the existing concrete slab, identifying cracking, joint breakdown, impact damage, surface wear and any delamination or previous coatings. In Trowbridge this often includes older industrial buildings around Canal Road and former textile sites where there may be multiple historic floor layers. Defective areas are broken out and reinstated, joints are rebuilt where necessary and incompatible finishes are removed. The slab is then mechanically prepared using grinding, shot blasting and diamond tooling to create a clean, profiled surface ready to receive a bonded warehouse floor overlay.

Right facing arrows STEP 2

Overlay Application
and Level Correction

Once preparation is complete we install the specified overlay system. Options include polymer modified cementitious toppings for heavier duty applications, cement based self levelling systems to correct levels and resin finishes where higher abrasion resistance or ease of cleaning is required. Overlay thickness and flow are controlled to reduce local undulations and improve regularity across racking aisles, picking zones and loading areas in Trowbridge warehouses and industrial units at White Horse Business Park, Railway Yard and surrounding estates.

Right facing arrows STEP 3

Curing, Joints
and Handover

After installation the overlay is cured in line with system guidance and the agreed programme. Fast curing materials can, where appropriate, allow controlled early access in roughly 24 to 48 hours, with full forklift loading and dense storage introduced once strength and hardness targets have been achieved. Movement and construction joints are recut or reinstated to manage slab behaviour and help limit future arris damage. At handover we carry out finish checks and provide maintenance and operating guidance suited to the Trowbridge facility and its duty profile.

Right arrow Why Choose Us

Warehouse Floors Resurfaced for
West Wiltshire Operations

Warehouse floor resurfacing in Trowbridge industrial unit
Load capacity icon

Substrate Condition
and Bond Quality

Trowbridge includes a mix of older industrial buildings and more modern warehouses, many with varied repair histories and surface treatments. We focus on substrate strength, moisture conditions and surface profile so primers and bonding agents can work correctly. A well prepared base allows the overlay to work compositely with the slab and helps reduce the risk of debonding or surface movement under forklift and pallet truck traffic.

Concrete overlay project in Trowbridge warehouse
Surface profile icon

Programme Planning
for A350 and Local Routes

Many Trowbridge facilities support regional distribution along the A350 and links to the M4 corridor. We plan resurfacing around intake and despatch schedules, town centre access constraints and shift patterns, using phased work zones and temporary access where required. This approach helps maintain output while still allowing sufficient time for preparation, overlay placement and curing.

Resurfaced warehouse floor in Trowbridge and West Wiltshire
Repair efficiency icon

Service Life
and Cost Control

Full slab replacement is disruptive and capital intensive, particularly in occupied Trowbridge units with established racking, services and production lines. Resurfacing retains the structural slab where it is sound and renews the wearing surface with an overlay suited to the site’s duty. This can extend floor life, reduce reactive patch repairs and provide a more predictable maintenance profile for operators across West Wiltshire.

Right arrow Trowbridge and Surrounding Areas

We carry out warehouse floor resurfacing and industrial overlay works across Trowbridge and West Wiltshire, supporting logistics, storage and manufacturing facilities along the A350 and Kennet and Avon corridors.

Trowbridge

White Horse Business Park

Canal Road Industrial Estate

Railway Yard and County Way Area

North Bradley

Staverton

Southwick

Bradford-on-Avon and Westbury

Request a Quote for Warehouse Floor Resurfacing in Trowbridge

We provide warehouse resurfacing, slab repairs and industrial overlay systems throughout Trowbridge, including White Horse Business Park, Canal Road Industrial Estate, Railway Yard and surrounding areas such as North Bradley, Staverton and Southwick. Our service covers surveys, defect repair, mechanical preparation and installation of bonded overlays matched to your loading, traffic and operating conditions.

Contact us to discuss a Trowbridge warehouse, production building or regional distribution facility, or to arrange a site visit and detailed proposal.

Or fill in the form below and our Trowbridge resurfacing team will respond promptly.

Right arrow FAQ

Warehouse Floor Resurfacing Trowbridge
Common Questions

Do you work in older industrial buildings around Canal Road and the town centre?
Yes. We regularly resurface floors in older industrial and warehouse buildings near Canal Road, County Way and the town centre. These often have historic coatings or multiple floor layers, so we focus on removal of unsuitable materials, localised repairs and mechanical preparation before installing a bonded overlay system.
Can resurfacing be phased so our Trowbridge warehouse stays operational?
In most cases, yes. We divide the floor into zones so only part of the building is out of use at any one time. Work areas, access routes and possession windows are planned around deliveries, shift patterns and local access constraints in and around Trowbridge, helping to limit disruption while works take place.
What overlay systems do you typically use in Trowbridge warehouses?
We install cement based self levelling systems, polymer modified cementitious overlays and resin finishes. The system is selected on the basis of slab condition, loading, materials handling equipment, internal climate and the level of surface regularity and finish required for the Trowbridge facility.
Can you improve levelness for racking aisles at White Horse Business Park?
Yes. Self levelling and engineered topping systems can reduce local high and low spots and improve overall regularity across racking aisles and pallet routes. This is particularly useful where layout changes or historical repairs have left different levels within units at White Horse Business Park or similar estates around Trowbridge.
How long before we can reintroduce forklift traffic after resurfacing?
Return to use depends on the chosen system, thickness and temperature. Some fast curing overlays allow controlled light traffic within approximately 24 to 48 hours, with full forklift loading and dense storage introduced once the floor has achieved its specified strength and hardness. We provide project specific timings for each Trowbridge scheme so operations can be planned safely around the works programme.
Do you work in nearby towns such as Westbury, Bradford-on-Avon and Melksham?
Yes. We carry out warehouse floor resurfacing and overlay projects across West Wiltshire, including facilities in Westbury, Bradford-on-Avon, Melksham and nearby villages linked to Trowbridge. The same survey, preparation and overlay process is used, adjusted to suit the layout and duty of each site.
What information helps you prepare a resurfacing quotation for a Trowbridge site?
Useful information includes floor area, slab age and condition, known defects, load and MHE types, access constraints, working hours and any planned layout or racking changes. Photographs or existing survey data also support accurate specification and programming for a Trowbridge warehouse or industrial unit.